Savoy Court Hotel, 11-15 Cavendish Place. Application ID: 180826 (PPP) and 180827 (LBC).

Minutes:

Planning permission for conversion of existing hotel into 15 residential one bedroom self-contained flats (Listed Building Consent sought under application 180827) – DEVONSHIRE.   

 

Resolved (180826) (A): (Unanimous) That subject to a subject to S106 legal agreement covering:

a) Local labour iniaitves and

b) Affordable housing initiatives

 

That permission be granted subject to the following conditions:

 

1. The development hereby permitted shall be begun before the expiration of three years from the date of permission.

2. The development hereby permitted shall be carried out in accordance with the approved drawings submitted on 16 August 2018:

2995/3/00 – Location and block plans

2995/3/01 ‘C’ – Lower Ground Floor Plan as proposed

2995/3/02 ‘B’ – Upper Ground Floor Plan as proposed

2995/3/03 ‘B’ – First Floor Plan as proposed

2995/3/04 ‘B’ – Second Floor Plan as proposed

2995/3/05 ‘C’ – Third Floor Plan as proposed

2995/3/06 ‘A’ – Third Floor Plan as proposed

2995/3/07 ‘C’ – Front Elevation as proposed

2995/3/08 ‘B’ – Rear Elevation as proposed

2995/3/09 ‘B’ – Rear/Side Elevation as proposed

2995/3/010 ‘B’ – Section as proposed

2995/3/11 ‘A’ – Site Plan as proposed

2995/3/12 ‘A’  – LG Floor External Steps 13 Cavendish Place

2995/3/13 ‘A’  – LG Floor External Steps 11 Cavendish Place

3. The materials to be used must match as closely as possible, in type, colour and texture those listed in the Heritage Statement (note: summary of work Section amended 12/09/18) and Section 9 of the application.

4. The refuse and recycling storage areas and cycle storage areas shall be fully implemented and made available for use prior to the first occupation of the development hereby permitted and shall thereafter be retained for use at all times; details of secure cycle parking facilities shall be submitted to and approved in writing by the Local Planning Authority prior to their installation.

5. Prior to the first occupation of the development hereby approved details of the hard and soft landscaping to the rear yard area shall be submitted to and approved in writing by the local planning authority; and all existing trees shall be retained, unless shown on the approved drawings as being removed.  All trees on and immediately adjoining the site shall be protected from damage as a result of works on the site, to the satisfaction of the Local Planning Authority. This should be in accordance with relevant British Standards (BS 5837:2012) for the duration of the works on site.  In the event that trees become damaged or otherwise defective within five years following the contractual practical completion of the development, the Local Planning Authority shall be notified as soon as reasonably practicable and remedial action agreed and implemented.  In the event that any tree dies or is removed without the prior consent of the Local Planning Authority, it shall be replaced as soon as is reasonably practicable and, in any case, by not later than the end of the first available planting season, with trees of such size, species and in such number and positions as may be agreed with the Authority.

6.  No development shall take place, including any ground works or works of demolition, until a Construction Management Plan has been submitted to and approved in writing by the Local Planning Authority.  Thereafter the approved Plan shall be implemented and adhered to in full throughout the entire construction period.  The Plan shall provide details as appropriate but not be restricted to the following matters,

a) the anticipated number, frequency and types of vehicles used during construction,

b) the method of access and egress and routeing of vehicles during construction,

c) the parking of vehicles by site operatives and visitors,

d) the loading and unloading of plant, materials and waste,

e) the storage of plant and materials used in construction of the development,

f) the erection and maintenance of security hoarding,

g) the provision and utilisation of wheel washing facilities and other works required to mitigate the impact of construction upon the public highway (including the provision of temporary Traffic Regulation Orders),

h) details of public engagement both prior to and during construction works.

7. Prior to the first occupation of the development hereby permitted details of any external boundary treatments other than those agreed on the approved plans shall be submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be undertaken in accordance with the approved details.

8. Prior to the first occupation of the development hereby permitted details of any replacement rainwater goods shall be submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be undertaken in accordance with the approved details.

9. New windows and external doors are to be of timber construction. No works shall commence on site until details of all new external windows and door joinery have been submitted to and approved in writing by the Local Planning Authority. The submitted details shall include depth of reveal, details of heads, sills and lintels, elevations at scale of not less than  1:10 and horizontal / vertical frame sections (including section through glazing bars) at not less than 1:2. These works shall be carried out in accordance with the approved details.

10. No external works shall commence until a scheme of decorative works is submitted and approved by the Local Planning Authority. This is to include colour samples of proposed new paint colours to the external joinery, painted render, ironmongery and canopies and the proposed new tile finish to the front entrances of No.s 11, 13 and 15.

11. That no demolition, site clearance or building operations shall take place except between the hours of 8:00 a.m. and 6:00 p.m. on Mondays to Fridays and 8:00 a.m. and 1:00 p.m. on Saturdays and that no works in connection with the development shall take place on Sundays or Bank Holidays unless previously been agreed in writing by the Local Planning Authority.

12. No satellite dishes shall be installed to the front elevation of the building. Prior to the first occupation of the development hereby permitted a communal satellite dish shall be erected at roof level in a location agreed by the local planning authority and retained as such unless agreed in writing by the Local Planning Authority.

13. No part of the development may be occupied until such time as a mechanism for securing the removal of the loading bays to the front of the site on Cavendish Place has been agreed in writing by the Local Planning Authority.

14. No part of the development shall be occupied until such time as until a Servicing Management Plan for has been submitted and approved in writing by the Local Planning Authority. This shall set out the arrangements for the loading and unloading of deliveries, in terms of location and frequency, and set out arrangements for the collection of refuse.  Once occupied the use shall be carried out only in accordance with the approved Service Management Plan.

15. Site Waste Management shall be undertaken in accordance with the approved plan, dated August 2018

16. No bonfires or burning of waste materials shall take place anywhere on the site at any time.

 

Resolved (180827 LB) (B): (Unanimous)That permission be granted subject to the following conditions:

 

1. Time limit

2. Approved plans

3. Materials

4. The cycling and refuse accommodaton to be provided prior to the first occupation

5. Hard and soft landscaping to include tree protection

6. Construction method statement

7. External boundary treatments

8. Rainwater goods

9. External joinery details

10. External decorative scheme

11. Demolition, site clearance or building operations hours

12. Satellite dishes

13. Removal of the loading bays

14. Servicing management plan

15. Site waste management

16. Waste materials

 

Informative

 

1. The development hereby approved is subject to a Section 106 Agreement between the applicant and Eastbourne Borough Council for local labour contributions.

2. The development hereby approved is subject to a Section 106 Agreement between the applicant and Eastbourne Borough Council for affordable housing contributions.

3. Failure to comply with any condition imposed on this permission may result in enforcement action without further warning.

4. The proposal may be a material change of use to which the Building Regulations 1991 apply and a building regulation submission may be necessary before the change of use takes place.

5. The applicant should consult the Building Control Section with regard to sound insulation and sprinkler system.

6. A formal application for connection to the public sewerage system is required in order to service this development, please contact Southern Water, Sparrowgrove House, Sparrowgrove, Otterbourne, Hampshire SO21 2SW (Tel: 0330 303 0119) or www.southernwater.co.uk

7. It is the responsibly of the developer to make suitable provision for the disposal if surface water. Part H of the Building Regulations prioritises the means of surface water disposal in the order

a) Adequate soakaway or infiltration system

b) Water course

c) Where neither of the above is practicable sewer

8. Due to changes in legislation that came in to force on 1st October 2011 regarding the future ownership of sewers it is possible that a sewer now deemed to be public could be crossing the above property. Therefore, should any sewer be found during construction works, an investigation of the sewer will be required to ascertain its condition, the number of properties served, and the potential means of access before any further works commence on site.

9. The applicant is advised to discuss the matter further with Southern Water, Sparrowgrove House, Sparrowgrove, Otterbourne, Hampshire SO21 2SW (Tel: 0330 303 0119) or www.southernwater.co.uk

10. In order to provide a safe and secure environment for future residents, Sussex Police suggest the following recommendations are implemented:

• Communal entrance doors are to be checked to ensure they are fit for purpose and have locks that conform to BS3621 / 8621 respectively, and has a door entry system compete with remote access from the flats. Access control would be advantageous.

• Flat front doors to conform to PAS 024-2016.

• Postal arrangements for the flats are through the wall, external or lobby mounted secure postboxes. It is strongly urged the applicant not to consider letter apertures within the flats’ front doors. The absence of the letter aperture removes the opportunity for lock manipulation, fishing and arson attack and has the potential to reduce unnecessary access to the block.

• Ground floor and any easily accessible windows are to conform to PAS 024-2016.

• Internal resistance measures to be incorporated into party walls and shared corridors to any stud partition walls.

• The fitting of dusk till dawn vandal resistant lighting to all entrance door including the lower basement entrances.

• The gating to the rear of the properties should be lockable from both sides.

 